Panel Tank Installations Exact site address details: Name and Number of site contact: Email of site contact: 1) SWMS Approved YesNo2) Adequate Lighting is set up in the tank plantroom. YesNoN/A (Outside)3) Room is vacant and obstructions to the tank positioning such as electrical conduits and fire services pipework have been redirected. YesNo 4) Lifting apparatus available on site for use, i.e. Telehandler and forklift. YesNo 5) All necessary connections, i.e. pipe and flanges, have been procured and available on site. We will do the penetrations through the necessary panels, but supply and installation of pipe/flange connections onto the tank by others. YesNo 6) Water supply so we can fill the tank once partially constructed. YesNo 7) Sufficiently sized drainage so we can immediately drain the tank once we have tested. YesNo 8) Concrete plinths installed and level as per our drawing, minimum 350mmH. Provide photos demonstrating this. YesNo (Maximum file size: 4MB) 9) Clear access to the plantroom for our vehicles for unloading our tools. YesNo 10) Area around and adjacent to the tank area clear. YesNo 11) Tank components & panels have been unloaded and positioned adjacent to the plantroom. YesNo Comments